Skip to the figures
Delay board
Window

SZU

Switzerland · Europe · Source: opentransportdata.swiss

Updated

Next update

Rank 56 of 71

Most delayed now SN 4 (12405) to Langnau-Gattikon, +1 min

Switzerland1.1 minutes late on average100% on timeTrains measured 268Cancelled 1No change since the last update

Trend

Average delay per hour in minutes, last 24 hours
Average delay per hour
Hour startingAverage delayTrains
02:00No trains0
03:00No trains0
04:00No trains0
05:00+0.4 min9
06:00+1.5 min16
07:00+1.9 min18
08:00+1.8 min17
09:00+1.7 min13
10:00+0.6 min11
11:00+0.4 min12
12:00+0.7 min12
13:00+0.7 min12
14:00+1.3 min12
15:00+0.5 min12
16:00+0.5 min17
17:00+2.0 min17
18:00+1.5 min18
19:00+1.4 min15
20:00+1.0 min12
21:00+0.6 min11
22:00+0.5 min12
23:00+0.4 min12
00:00+0.3 min7
01:00+0.4 min2

Distribution

268 trains in the last 24 h, by how late each one was at its latest report.

How late trains were, in delay bands
BandShare of trainsTrainsPercent
267100%
5–15 min late
00%
15–30 min late
00%
30+ min late
00%
Cancelled
10%

Most delayed

The five most delayed trains in the last 24 h.

TrainRouteDelayMeasuredLast report
S 10 (12773)to Uetliberg+5 min
S 10 (12772)to Zürich Selnau+4 min
S 10 (12905)to Uetliberg+4 min
S 10 (12789)to Uetliberg+4 min
S 10 (12781)to Uetliberg+4 min

Method

One GTFS-RT feed carries delays for every Swiss operator that delivers realtime data, read every 2 minutes. Each trip is matched to the static timetable, which gives its operator, line and scheduled times.

  • A train’s delay is its delay at the last stop it has passed, stored as actual; before its first stop, the forecast for the next one, stored as current.
  • The feed sends a delay only where it changes; Delay board lays it over the timetable and carries it on to the stops after.
  • Rail trains of 14 operators with realtime for at least 92% of their trains count. Appenzeller Bahnen, TRAVYS and LEB (less), CJ and the mountain and rack railways (none), night trains, and buses, trams, boats and cableways are left out. DB’s ICE trains count under DB Fernverkehr.
  • Skipped stops are not counted as cancellations; only fully cancelled trips are.

License: opentransportdata.swiss terms of use.
Attribution: Data source: opentransportdata.swiss.

opentransportdata.swiss (opens in a new tab)How Delay board ranks